Hardware for National Sovereignty

Powering the Disconnected.

A modular, containerized energy initiative to build a resilient, redundant, and self-replicating infrastructure for the Philippines' 7,000+ islands.

The Barrier is Accessibility

Current energy solutions are permanent, expensive, and black-boxed. To grow the country, we need a paradigm shift.

Immobile

Traditional grids cannot move. When disaster strikes or industry shifts, infrastructure is stuck.

Black-Boxed

Proprietary systems require foreign specialists for repair, leaving islands helpless during breakdowns.

Unscalable

Imported tech is expensive. We need domestic mass production to reach every island.

INTRODUCING THE SBC

Solar Battery Container.
Power Plant in a Box.

Standard 20ft & 40ft ISO containers transformed into precision-engineered kinetic machines. Designed for the archipelago.

  • One-Person Deployment

    A proprietary folding armature allows a single person to deploy or retract the system in minutes. Typhoon ready.

  • Battery as Ballast

    Integrated LiFePO4 batteries act as counterweights, preventing tipping without concrete foundations.

  • Smart Steward System

    Comfac Steward System (GMT+8 Support) monitors health, temperature, and security. Includes Micro-Data Center capabilities.

Open Source
SBC CAD Render
20-50k
Transport Cost (PHP)
50%
Daily Autonomy

Strategic Roadmap

From Knowledge to Logistics (2025-2027)

Phase 1: Knowledge Foundation

The FreeCAD Initiative (2026)

Total mastery of open-source engineering. Drawing, Sheet Metal, Milling, and Assembly. Creating the "Source Code" for the hardware.

  • • Part Design & Sketcher
  • • TechDraw for Manufacturing
  • • Path for CNC Milling

Phase 2: Living Lab

Cabuyao Manufacturing Plant

2.4 Hectare prototype micro-grid. 1MW Solar + 1MW Battery. Powering a Data Center to prove stability. BIPV & ESCO Certification.

IN PROGRESS

Phase 3: Logistics Network

Inter-Island Transport

Moving a 20ft power station for 20k-50k PHP. Offering Design Services to shipping companies in exchange for logistics partnerships.

Democratizing Energy Economics

We target Luzon's manufacturing belt to ensure fast ROI. By decentralizing production to Iloilo, CDO, and Cabuyao, we crash the cost of deployment.

Base Solar Cost

₱20,000 / KW

Integration (Container + Battery)

₱30,000 / KW

Target Total

₱50,000 / KW

Stretch Goal: 40k

Financial Instruments

We provide Cost-Benefit Analysis models for LGUs and Factories, factoring in:

  • Avoided Diesel Costs
  • Prevention of Downtime
  • Grid Fluctuation Protection

The 2037 Trajectory

Manufactured Capacity

₱20 Billion

Infrastructure Value

₱100 Billion

This output translates to the creation of critical infrastructure—power, networking, and compute—empowering communities across the archipelago.

Evolution of Cornersteel

Furniture Structures Civilization