Live deployment · The Philippines

Energy Special Company, Inc.
Certificate of Acceptance

ESCO inspected the delivered system — the ERPNext accounting module together with the Comfac Philippine localization — and found every required report and form configured. The system has been accepted and can now be used as ESCO's operating accounting system, with a further BIR inspection to follow.

Accepted — in use

ESCO's review covered the accounting module, the statutory report set and the accredited forms. All were found configured. The acceptance means the ERPNext system is now ESCO's live accounting environment; a BIR inspection visit is expected as the next formal step.

What was inspected and confirmed

34

Required BIR statutory reports, all enabled

54

Custom print formats enabled, including the BIR form set

330

Total reports available on the instance

15.121

ERPNext version the acceptance was given against

Counts read from the live instance (erp.esco-inc.co) on 2026-10-24: Frappe Framework 15.121.3 · ERPNext 15.121.6 · Frappe HR 15.64.2 · Print Designer 1.6.7 · Bureau of Internal Revenue 19102026.1.

The digitization filing at BIR RDO 041

What was filed

Alongside the acceptance, the application to use the system as a Computerized Accounting System was filed with the Bureau of Internal Revenue. The BIR's own checklist of documentary requirements for a change of software / version was completed and received by Revenue District Office No. 041 – Mandaluyong City.

  • General requirements — sworn statement and the service provider's description of the system, including the system's capabilities, functions and features
  • Sample report requirements — dummy sample reports, three sample auditable reports, and a soft copy of the Audit Trail
  • Certification from the company, signed by an authorised representative

Status note. Receipt of the documentary requirements by the RDO is a step in the permitting process, not the final permit. A BIR inspection follows, which is consistent with ESCO's notice of a return visit.

BIR Checklist of Documentary Requirements (Annex A), Revenue District Office No. 041 Mandaluyong City, for Energy Special Company Inc, stamped RECEIVED 21 October 2026
Evidence. BIR Checklist of Documentary Requirements (Annex "A"), RDO No. 041 – Mandaluyong City, stamped RECEIVED 21 October 2026. Click to open full size. Taxpayer identification number and signature are redacted in this published copy.

Sequence

  1. Build

    ERPNext deployed with the Comfac localization; statutory reports and BIR forms configured and tested against ESCO's data.

  2. 2026-10-21

    BIR RDO 041 receives the checklist of documentary requirements for the change of software / version application.

  3. Acceptance

    ESCO inspects the documents and the configured system, and accepts it. The system may now be used.

  4. Next

    BIR inspection visit, completing the permitting path.

About the client: escoincsolutions.com. ESCO is the first deployment to carry this configuration through to client acceptance; the report and form set is described on the Localization page.